The remodeled house on MLK Jr. Way passed the final inspection with flying colors. It features state of the art mini-split heating and cooling systems as well as a number of energy saving equipment. The first shot shows what the house was taken down to before the rebuild began.
This is a small 480 square foot single bedroom cottage. These are the before and…
We worked on Saturday in order to get the new floor joists rolled out on…
We have been Featured in this month’s Journal of Light Construction for our tapered LVL roof…
house addition and remodel – we are framing the last room on the bottom right,…
Blue Dog Construction and Renovation was awarded “BEST GREEN CONSTRUCTION COMPANY IN THE SAN FRANCISCO…
Removal of the old roof Removal of the old roof Installing the new TJI floor…