Job Blog

Current Projects

We are currently working on a number of new projects. One of the main ones is a passive house in the heart of Berkeley. The house is being fitted with a rain water recovery and storage system as well as a grey water system. It will also feature an HRV (Heat Recovery System) as well as passive house-style sealing of the outer building fabric. The interior framing has been strengthened and modified to suit current earthquake safety standards.

The slab was also insulated using foam glass insulation and fitted with a radiant heat system.

Another project we have just started is the renovation of this church located in the heart of Berkeley. We are restoring the exterior façade on all four sides of this historic building.

The flat roof and flashing on all promontories has been redone

Andrew

Share
Published by
Andrew

Recent Posts

Refurbished Cottage

This is a small 480 square foot single bedroom cottage. These are the before and…

7 years ago

House renovation on Martin Luther King in Berkeley

We worked on Saturday in order to get the new floor joists rolled out on…

7 years ago

We Are Featured in this Month’s Journal of Light Construction

We have been Featured in this month’s Journal of Light Construction for our tapered LVL roof…

8 years ago

2,500 square foot house remodel

house addition and remodel – we are framing the last room on the bottom right,…

8 years ago

Blue Dog Construction and Renovation awarded Best Green Construction for 2016

Blue Dog Construction and Renovation was awarded “BEST GREEN CONSTRUCTION COMPANY IN THE SAN FRANCISCO…

9 years ago

Installing a new floor joist system on an existing house – getting ready to add a second story addition

Removal of the old roof Removal of the old roof Installing the new TJI floor…

10 years ago